Powering construction sites with clean energy, lowers Co2 emissions and reduces fuel costs
The Legacy Diesel Problem
Running a diesel generator 24/7 is an inefficient way to power your project. Powering tower cranes, hoists and site cabins and welfare units, will significantly increase the energy costs for your project
The Battery Solution
BESS units can absorb heavy starting currents that tower cranes demand, while a small grid connection or generator can intelligently charge the BESS units when the SOC (State or Charge) reaches a predetermined level, to ensure the site has sufficient power available
"Powering Construction sites with clean energy, lowers Co2 emissions and reduces fuel costs"
I think we should talk
Tell us what you're trying to power and your operating environment — we'll help you find a smarter approach.